Log of Alberg 30 #262 on 16 April 2017


Date: 16 April 2017 12:00 till 16 April 2017 16:30
Endpoints: Smith's Marina to Smith's Marina
Purpose: Prepare for Launch
Complement: Jonathan Bresler
Weather: Mid 80's

  • Removed the winter cover.
  • Washed/Scrubbed the deck and cockpit.
  • Painted the filled manual bilge pump hole with EZ Poxy 2 , third coat.
  • Painted the relocated manual bilge pump thru hull.
  • Painted the scraped six areas of the hull below the water line that were bare or had loose antifouling with a second coat.
  • Stowed shore power cord.
  • Replaced the Velcro holding the cover on the compass.
  • Tightened the four bolts holding the mast plates together.
  • Stowed shore power cord.
  • After three hours of drying time, per the instructions on the can of PCA Gold , applied a third coat and used all of the remaining bottom paint on the waterline, bow and underside of the cabin body.

© Jonathan M. Bresler