Worked with TC to ready Argo for the season. Attached the gooseneck track to the mast using bolts and hose clamps. Attached blocks to both the gooseneck and the deck to run the clew reefing line. Attached another block to run the tack reefing line. Attached the boom to the mast. Lubricated a number of shackles and the spinnaker pole ends. Sorted various lines to find a pair to use as spinnaker sheets. Filled gas tank.