Log of Alberg 30 #262 on 06 June 2017


Date: 06 June 2017 11:15 till 06 June 2017 14:00
Endpoints: Yacht Haven Annapolis Eastport MD to Yacht Haven Annapolis Eastport MD
Purpose: Continue refinishing the chimney and teak trim pad. Continue painting v-berth.
Complement: Yoni Bresler
Weather: Mid 80s, clear, beautiful day

  • Applied third coat of Cetol Marine Natural Light to teak chimney trim ring.
  • Applied third coat of High Gloss White to
    • the hull to deck joint,
    • the forward bulkhead,
    • the aft bulkhead,
    • the hull above the shelf,
    • the top side of the shelf,
    • the under side of the self,
    • the vertical face of the forward hatch opening,
    • the area around the deck organizer located on the port side at the forward end of the coach roof,
    • the perimeter of the port side of the v-berth flat, and
    • a strip about two inches wide around each of the items above so that the rest can be rolled rather than brushed.
  • Applied first coat of High Gloss White to the overhead, hull sides, and flats of the v-berth. Started third quart of Rustoleum.

© Jonathan M. Bresler