Completed work from yesterday by moving the middle of the mast slightly to port, half turn open on the starboard forward lower shroud and half turn closed on the port forward lower shroud. Returned the boom to its location. Returned the newly patched jib to its track, port side this time, in the roller furler.
Reefed the main in the river at the start of the sail to reduce loads on the newly tuned rig. Seems that there is less weather helm, but hard to assess due to the reef in the main.
GPX formatted Track distance: 10.46, average speed: 4.1kts, duration: 2:32