- Lightly washed deck.
- Removed jib and mainsail.
- Replaced jib halyard with black 2mm halyard leader
.
- Removed jib sheets, jib sheet blocks, mainsheet, main reefing line, main reefing lines blocks, and vang.
- Tied off the boom to the spinnaker sheet block padeyes to secure the boom from swining.
- Jib sheets and blocks stored with jib. Mainsheet, main reefing line, main reefing lines blocks, and vang hung from port side rail in cabin.
- Raw water strainer and basket cleaned and removed from engine to prevent the propylene glycol from damaging the plastic.