Log of Alberg 30 #262 on 12 December 2017


Date: 12 December 2017 13:00 till 12 December 2017 16:00
Endpoints: Yacht Haven Annapolis to Yacht Haven Annapolis
Purpose: Winterization completed
Complement: Yoni Bresler
Weather: mid 40's. Strong breezes.

  • Drained and rinsed glycol from raw water strainer.
  • Removed impeller from raw water pump and tied impeller to body of pump.
  • Lead topping lift aft to boom vang bail and back to mast cleat to prevent slapping.
  • Removed both alternator belt and raw water pump belt.
  • Clipped boom to backstay pendant.
  • Replaced main halyard with 2mm halyard leader.
  • Hung a packet of Damp Away II in v-berth.
  • Started charing batteries.
  • Filled fuel tank to the top with 3 gallons of diesel.
  • Rerouted automatic bilge pump hose so that it comes up to the underside of the side deck before dropping to the thruhull. Hose no longer intertwined with various wires including RG58 used by the Garmin GPS antenna.
© Jonathan M. Bresler