Log of Alberg 30 #262 on 08 March 2018


Date: 08 March 2018 12:15 till 08 March 2018 16:00
Endpoints: Yacht Haven Annapolis to Yacht Haven Annapolis
Purpose: Continue Cockpit Painting Project
Complement: Yoni Bresler
Weather: Mid 50's, light breeze

  • Machine sanded all parts of the cockpit possible using the Ridgid quarter sheet sander . Took about two hours.
  • Machine sanded the inside sections of the starboard cockpit locker that will be covered or hard to reach once the instrument panel and engine throttle are reinstalled.
  • Trimmed copper drain pipe that runs from the starboard cockpit locker drain channel to a spot just above the starboard cockpit scupper using the cutoff wheel of the Ridgid multitool
  • Hand sanded all the other parts of the cockpit but for the cockpit floor.
  • Forgot to hand sand the icebox opening.
  • Next steps:
    • Sand cockpit floor.
    • Sand winch bases.
    • Sand cover for indent in bridge deck.
    • Hand sand the icebox opening.
    • Scrape inside of cabin aft wall and side walls where the coamings land.
    • Remove the access plate in the cockpit floor.
    • Need to decide whether or not to remove the cockpit drains for this project.
© Jonathan M. Bresler