- Installed oak fiddles on both shelves in hanging locker using two pieces left from installing fiddles in the v-berth. After doing left with two pieces of scrap less than 2" in length.
- Re-installed Gusher Galley Pump
below sink in galley. Quite a bit a work due to restricted access.
- Re-installed spout in galley work surface.
- Filled tank beneath v-berth.
- Verified that the pump works as it should.
- Used a coat hanger to ream out cockpit drains.
- Flushed cockpit drains with hose, forcing all the water down the drain.
Need to remove the fiddles, sand, and finish.