Log of Alberg 30 #262 on 18 December 2018


Date: 18 December 2018 12:00 till 18 December 2018 16:00
Endpoints: Smith's Marina to Smith's Marina
Purpose: Begin Refurbishing Head
Complement: Jonathan Bresler
Weather: Mid 40's

  • Removed head door which was secured by 9 #8 3/4" phillips screws. MISSING one screw.
  • Removed hanging locker door which was secured by 9 #6 3/4" square drive screws.
  • Removed four 1/4" bolts holding the head to the floor.
  • Removed toothbrush holder.
  • Removed toilet paper holder.
  • Removed soap tray above Pullman sink.
  • Removed Pullman sink.
  • Removed trim at front edge of head floor and at base of head door.
  • Removed brass fresh water naval pump.
  • Removed fire extingisher holder.
  • Removed mirror.
  • Removed toilet instructions plaque from Wilcox & Crittenden.
  • Removed sanitation hose from head thruhull using Weller(?) heat gun to soften the hose. 20 seconds on low works well.
  • Removed head cabinet doors.
  • Removed brown fake wood shelf paper from inside head cabinet.
  • Removed screws holding bottle/drink shelf in salon to the bulkhead.
  • Removed screws holding magazine rack in salon to the bulkhead.
  • Removed three bolts holding a U-shaped block in salon to the bulkhead.

© Jonathan M. Bresler