- Removed front piece from each of the three shelves in the hanging locker.
- Removed clothes rod supports.
- Removed two vertical ~3/4" square section wooden stops from aft side of opening to hanging locker. Left the short topmost piece which is "locked" in place by the top shelf.
- Removed Newport solid fuel stove from hanging locker bulkhead.
-
- Heated head through hull to about 120 degrees F using Weller heat gun.
- Sprayed PB-Blaster on head through hull screw joints.