Log of Alberg 30 #262 on 29 March 2019


Date: 29 March 2019 10:30 till 29 March 2019 16:00
Endpoints: Smith's Marina to Smith's Marina
Purpose: Wrapping up Winter Projects for now and Preparations for Launch
Complement: Jonathan Bresler
Weather: Low 50's

  • Used a 1/8" x 1" cotter pin to secure the castellated nut on the prop installed yesterday.
  • When the prop is hidden behind the deadwood, the keyway for the prop and for the engine coupling is TDC and BDC.
  • Applied the third coat of Awlwood to the companionway sill after sanding with 220 grit.
  • Applied a second coat of Awlwood to the top, front, fore and aft sides of the cockpit seat lockers after sanding with 400 grit.
  • Taped the bottom of the boot stripe.
  • Applied to two coats of Rustoleum High Gloss White to the boot stripe.
  • Painted with EZ Poxy 2 filled area were manual bilge pump outlet was located.
  • Painted the hull with PCA Gold . One coat, about 1/2 a gallon. Left a one inch strip immediately below the boot stripe unpainted as the boot stripe was still wet.

© Jonathan M. Bresler