- Assembled and installed the forward hatch.
- Installed the icebox hatch.
- Applied UHMW tape, 7 mil thick, to the underside of the companionway hatch where it rests on the metal slides and where the forward vertical section contacts the cabin top.
- Applied UHMW tape, 7 mil thick, to the lip of the cabin under the companionway hatch.
- Use a wirebrush to clean the new two blade prop.
- Coated the prop with two layers of zinc spray.
- Painted the underside of the keep that had been resting on blocks while the boat was in Smith's cradle where she will spend the night.
- Placed docklines and springs for the crew at Smith's to use in tying up the boat should she be launched before I arrive.
- Inspected the rudder shoe. There is between 1/16" and 1/8" of an inch of play between the shoe and the pin.
- The pintle is installed on the hull, pin pointing downwards. The gudgeon is installed on the rudder. Both glassed in place. No visible wear on the pin of the pintle.
- Rove lazy jacks.