Log of Alberg 30 #262 on 19 May 2020


Date: 19 May 2020 14:30 till 19 May 2020 16:30
Endpoints: Yacht Haven Annapolis to Yacht Haven Annapolis
Purpose: Preparations for Sailing. Reeve lines.
Complement: Yoni Bresler
Weather: Low 60s, white caps on Spa Creek.

  • Rove main topping lift.
  • Installed boom.
  • Installed mainsheet.
  • Installed traveller.
  • Checked standing rigging. Aft lowers loose, snugged up. Headstay stretched a bit, it appears.
  • Inserted cotter pins in all upper stud terminals. Need to insert in lower terminals as well.
  • Started interior cleanup before sailing. Threw out trash from rigging. Sorted various pieces of hardware. Re-stowed tools. Etc.
© Jonathan M. Bresler