-  Rove main topping lift.
-  Installed boom.
-  Installed mainsheet.
-  Installed traveller.
-  Checked standing rigging.  Aft lowers loose, snugged up. Headstay stretched a bit, it appears. 
-  Inserted cotter pins in all upper stud terminals.  Need to insert in lower terminals as well.
-  
-  Started interior cleanup before sailing. Threw out trash from rigging.  Sorted various pieces of hardware.  Re-stowed tools. Etc.