- Continuing work begun on 2020-02-24
- Moved all remaing items out of the cabin into the v-berth, but for those in the galley shelves, the lockers, and the shelf by the companionway.
- Scraped the overhead of the hanging locker and the head.
- Sanded the shelves in the hanging locker.
- Lightly sanded the inside of the hull in the hanging locker.
- Continued removing paint in the cabin by scraping. Got the starboard side from centerline done.
- Remaining areas:
- Lockers, both faces and inside
- Settes, both flats, backs and underneath