- Returned old group 27 house battery to Pasco for a credit.
- Moved all sails from the v-berth to to the starboard settee.
- Moved cushions fromn the house to the port side of the v-berth.
- Cut from plywood three parts, base and two legs, for the Albin Bilge Pump Heavy Duty 2250 GPH 12V
bilge pump.
- Coated the three parts with WestSystem epoxy. Used the excess epoxy to add to the thin coating on the v-berth fill boards.
- Created handles for the spinnaker jaw release loops from 1/2" clear plastic tubing.
- Installed "prototype" traveler line retainers around the Harken 14 mm Lead Ring
rings.