Log of Alberg 30 #262 on 12 March 2021


Date: 12 March 2021 11:00 till 12 March 2021 15:00
Endpoints: Yacht Haven Annapolis to Yacht Haven Annapolis
Purpose: Prep Cabin for Refinishing
Complement: Yoni Bresler
Weather: Mid 60's to Low 70's.

  • Coated raw cut plywood edges of the settee backs and under side deck locker shelfs with epoxy.
  • Sealed all holes in the cabin top with 4200 so that no water/rain enters cabin during refinishing.
  • Filled 1/4" holes through which port Harken deck organizers was mounted at the wrong angle, inboard end forward.
  • Drilled new 1/4" holes through which port Harken deck organizers will be mounted at the right angle, inboard end aft.
  • Removed disconnected red light marked "Reverse" from under starboard lockers just forward of galley (just visible in photo below).
  • Using a heat gun, removed adhesive backed plastic shelf paper from inside the starboard lockers under the side decks. Doing so revealed mold that has been growing under the shelf paper where there were air gaps and mmoisture entered the gap.