Log of Alberg 30 #262 on 13 April 2021


Date: 13 April 2021 11:00 till 13 April 2021 16:30
Endpoints: Yacht Haven Annapolis to Yacht Haven Annapolis
Purpose: Started Priming the Cabin
Complement: Yoni Bresler
Weather: Mid 50's

  • Drilled two 7/8" holes in the bulkheads at the fore and aft ends of the port lockers. New route for electrical wiring in place of present path below the lockers. Wires will be contrained by ZipTies and tied up between the hull and the bolts securing the toe rail.
  • Cut in with Rustoleum Wood and Fiberglass Primer all surface joints, around deadlights, and around handrails.
  • Rolled Rustoleum Wood and Fiberglass Primer on the overhead, under the port side deck, and aft bulkhead.
  • Used an entire quart of the primer. Marked as covering 100 sq. ft.
  • Hull inside lockers, locker shelves, storage areas under the lockers, and settees remain unprimed at this point.
  • Appears that the solvent in the primer loosened existing paint that had resisted scraping, sanding, and multiple washings.

© Jonathan M. Bresler