- Rove spinnaker halyard.
- Rove spinnaker topping lift.
- Ran existing wires via new path at the top of the port lockers in place of diving down through a shelf in the "cave", below the port lockers, and up through a shelf in the head.
- Reconnected the anchor, bow, deck, lights at the terminal block in the head.
- Reconnected the wind vane wires at the terminal block in the head.
- Reconnected the wind vane wires to the instrument.
- Reconnected the depth finder wires to the instrument.
- Reconnected the antenna to the VHF radio.
- Verified that all light and the radio work. Only the stern ligth remains to be connected.
-
- Applied second finish coat of Rustoleum High Gloss White
to the locker faces.