Log of Alberg 30 #262 on 19 April 2021


Date: 19 April 2021 09:30 and 1500 till 19 April 2021 11:30 and 1630
Endpoints: Yacht Haven Annapolis to Yacht Haven Annapolis
Purpose: Rig Some Lines and Electricals, Finish Coat on Locker Faces.
Complement: Yoni Bresler
Weather: Low 60's

  • Rove spinnaker halyard.
  • Rove spinnaker topping lift.
  • Ran existing wires via new path at the top of the port lockers in place of diving down through a shelf in the "cave", below the port lockers, and up through a shelf in the head.
  • Reconnected the anchor, bow, deck, lights at the terminal block in the head.
  • Reconnected the wind vane wires at the terminal block in the head.
  • Reconnected the wind vane wires to the instrument.
  • Reconnected the depth finder wires to the instrument.
  • Reconnected the antenna to the VHF radio.
  • Verified that all light and the radio work. Only the stern ligth remains to be connected.
  • Applied second finish coat of Rustoleum High Gloss White to the locker faces.

© Jonathan M. Bresler