- Brought the drawers back to the boat.
- Brought the cabin cushions back to the boat.
- Removed blue masking tape and paper sheeting.
- Reinstalled teak rails at the top of the settee backs.
- Scrubbed the cabin top before working on the deck organizers, line clutches, and cabin top winches.
- Bought correct length bolts for all cabin top penetration at Fawcett's and WestMarine.
- Bought sealant, BoatLife LifeSeal, for all cabin top penetration at WestMarine.
- Note on bottom of Spinlock line clutch warns against polysulfide, recommends silicone.
- Back to WestMarine to return the LifeSeal and purchase 3M Marine Grade Silicone Sealant.
- Reinstalled deck organizers, line clutches, and cabin top winches with a generous loop of 3M Marine Grade Silicone Sealant around each hole (Meredith, Christian and I)
- Ran the main, genoa and spinnaker halyards via the deck organizers and line clutches (Meredith, Christian and I)
- Ran the topping lift and downhaul via the deck organizers and line clutches (Meredith, Christian and I)
- Ran the first reefing line (Meredith, Christian and I)
- Tightened all the setscrews for the stanchions (Meredith and Christian)
- Supported the wiring running from the panel to the head via the port lockers by zip tying them to the toe rail bolts.