Hauled one day too early this year. November 18th was a wonderful day with good breezes and temperatures reaching the low 70's.
- Removed main reefing lines, outhaul, sheet, and vang.
- Replaced main halyard with 1/4" dacron polyester rope (red whippings).
- Removed genoa halyard.
- Removed spinnaker downhaul.
- Replaced spinnaker halyard with 1/4" dacron polyester rope (green whippings).
- Replaced spinnaker topping lift with 1/4" dacron polyester rope (white whippings).
- Removed raw water pump impeller (hanging on engine).
- Removed fan belts (hanging on engine).
- Removed, rinsed, and light re-installed raw water strainer.
- Washed bilge with Simple Green.
- Drain head bowl by removing plug in aft end (end cap sitting on opened seat).
- Placed spinnaker pole in v-berth.
- Tiller, tiller head, and rudder head removed.