Log of Alberg 30 #262 on 09 December 2021


Date: 09 December 2021 1430 till 09 December 2021 1730
Endpoints: Smith's Marina to Smith's Marina
Purpose: Continue sanding hull below waterline
Complement: Yoni Bresler
Weather: Low 40's

  • Sanded the rest of the port side of the hull below the waterline from the point that the keel is full depth aft.
  • Started a second round at the bow on both sides back to about the first support.
  • Just under two hours using the Bosch 3017DVS 5" random orbital sander and 60 grit Diablo 5" SandNet discs .
  • Removed the old wasted zinc from the prop shaft.
© Jonathan M. Bresler