First day with temperatures that allow TotalFair
to cure, meaning 50* or more. Lost Sunday, Monday, and Tuesday to cold or rain or both.
Scrubbed and rinsed the hull.
Replaced the bolts holding the mid-rudder gudgeon to the hull.
Applied TotalFair
to the starboard side of the hull. Overlapped the flaws in the existing filled areas well. Hopefully this may be the last filling on this side of the hull forward of the from the bow to a couple feet aft the forefoot.
Applied TotalFair
to the depth sounder, the galley outlet, the scupper, the head outlet, and the head intake. At that point, I ran out of the filler. End of the first gallon.