Date: 05 April 2022 1230 till 05 April 2022 1600
Endpoints: Smith's Marina to Smith's Marina
Purpose: Continue fairing and more
Complement: Yoni Bresler
Weather: Rain and low 50's

  • Sanded the filled areas, the areas of the mid-rudder gudgeon and pintle.
  • Sanded deep spot on port bow due to pulling a bit of tape out from behind the epoxy barrier layer. See photo below.
  • Attempted to sand the strip (~1") of bottom paint above the epoxy below the boot stripe. Will take too long. Forget it. Cover with bottom paint.
  • Rinsed, scrubbed and rinsed the hull from the bow aft to the cockpit scuppers.
  • Filled the areas of the mid-rudder gudgeon and pintle.
  • Sorted out a bit of the accumlated items in the cabin and v-berth.