- Used a 1" Forstner bit to make finger holes in each of the four shelves.
- Used a router with a 1/8" round bit to round over the top and bottom of each of the finger holes.
- Applied a layer of WestSystem epoxy to the shelves and the replacement drop board.
- Went out to Annapolis to work on Constance
- Brought all the lines back to the boat.
- Removed the boom.
- Installed an additional strap eye on the starboard side of the boom to keep the first reef line to drooping into the space on deck that the crew needs.
- Installed three strap eyes on the port side of the boom for the outhaul. Can be used for the second reefing line, as well.
- Attached the new DNR registration stickers to the bow. Good till 2024-12-31.