Log of Alberg 30 #282 on 18 April 2023


Purpose: Shelves and Spring Re-commissioning (continued)
Complement: Yoni Bresler
Weather: High 70's
Engine Hours: 374.1 to 374.6

  • Sanded tiller with 220 grit.
  • Applied High Gloss Clear Varnish thinned 33% with brushing thinner to tiller -- second coat.
  • Replacement upper dropboard too tacky to sand. Still. Varnished two days ago. Perhaps brushing thinner should (must?) always be added to High Gloss Clear Varnish ?
  • Ran out of Rustoleum Wood and Fiberglass Primer .
  • Appiled Rustoleum High Gloss White to the bottom surface of the shelves to be placed outboard settee backs.
  • Reeved replacement main halyard.
  • Ran engine for 30 minutes.
  • Bent on Interrupt mainsail.
  • Still need to bend on genoa and bring cushions aboard.

© Jonathan M. Bresler