Log of Alberg 30 #262 on 12 June 2023


Endpoints: Silver Spring MD to Silver Spring MD
Purpose: Continue Fixing the Head Dorade Box
Complement: Yoni Bresler

  • Nothing like primer to show the spots that were missing in filling and fairing.
  • About 1100, applied TotalFair to fill the few divots and imperfections left from yesterday's filling.
  • Given today's temperatures of 80*, the filler should be sandable in about 5.5 hours 1630.
  • About 1630 or so, sanded smooth the filler added this morning and the Pre-Kote applied yesterday.
  • Solvent washed the outside of the dorade box.
  • Applied another coat of Pre-Kote . Would call it a second coat but for the amount of the first coat, yesterday's, removed in today's sanding.
  • The dorade box appears smoother than ever. May end up being the smoothest, more faired part of the deck.


© Jonathan M. Bresler