Earlier in the week, TC had brought the A-frame from the Lehman's home to Whitehall Yacht Yard.
Spent near two hours preparing to drop the mast by removing the boom, disconnecting all electrics and instruments, bringing all lines to the bottom of the mast, moving the boat to a location where we could walk the mast onto shore after dropping, setting up the A-frame, disconnecting the stays and shrouds. After all that was done, took only 10 minutes to drop the mast without any drama. Carried the mast to the designated location so that TC can work on it there.
Dropped the A-frame, secured it to the deck, moved Argo back to her slip, and called it a day.