Arrived at Smith's around 1230. Removed a bit of residual water from the bilge...perhaps as much as half of the capacity of the shop vac.
No water on the port shelf above the v-berth, forward of the first chainplate. No water in the hanging locker.
Set the fan in the companionway, with the forward hatch open, to air the boat while I worked on the bottom.
Began this season's longboarding using a 24" Dura-Gold Longboard with 120grit Dura-Gold Roll Sandpaper . Covered perhaps one-quarter of the port side in 90 minutes. Most effective during first half-hour. Hard work. Noticeable amount of sweat dripping from Full Face Respirator when removed. Wrists and backs of gloves saturated. Despite wearing a t-shirt and jeans under the Tyvek suit.
Note: the bottom colors are, from the outermost inward:
From Winter 2021-2022:
2022-04-04
2022-03-22