Scrubbed out the aftmost three storage areas below the cabin sole. The two aftmost are the "battery boxes". Used Simple Green, a plastic bristle Libman brush, and ScotchBrite. Cleaner, but there is still quite a way to go to get them clean.
The jackstands were moved. Painted the areas where the jackstands were with Trinidad SR , first coat.
Rove all the running rigging but for the spinnaker halyard. Need to go up the mast to reeve that halyard. Need to replace the genoa halyard block, the vang single block, and perhaps the spinnaker halyard block.