Reinstalled the head, its supporting shelf, the doors to the head "cabinets", and head door. Tested head...leaking around the shaft of the pump...needs to be addressed.

Reconnected mast lights, wind instrument, bow light wiring that is located in the upper head "cabinet".

Reinstalled fiddles and bar in the hanging locker.

Removed some excess items from the boat in preparation for racing.