- Replaced sealant where the chainplates pass through the deck.
- Cut a 1/4" diameter drain hole in the aft (low) side of the head locker.
- Sealed the wood of the head locker face with epoxy.
- Touched up the epoxy filling (mostly) the inner jib track mounting holes so that they are completely full.
- Filled the #10 wood screw holes in the port toe rail where the bow chock had been will 3/16" wooden dowel. Sealed all surfaces of the 3/16" wooden doweling with epoxy.