Log of Alberg 30 #262 on 27 March 2025


Date: 27 March 2025 1100 till 27 March 2025 1400
Endpoints: Whitehall Marina to Whitehall Marina
Purpose: Applied first coat of bottom paint.
Complement: Yoni Bresler
Weather: Low 50's, Force 3 winds.

  • Replaced the portside slotted flathead machine screws (1" x 1/4" silicon bronze) with a Philips headed screw from WestMarine. The slot was damaged enough that I a bit of difficulty removing the screw. Would have preferred a slotted head, but it was not available at WestMarine.
  • Applied first coat of Trinidad XSR . Used half a gallon of paint. Applied the small amount of extra to the bow on both sides. (see photos below.)



© Jonathan M. Bresler