- Replaced each of two pieces of 1/4" Sta-Set securing the solar panel to the staples on each cockpit locker with a section of solid rubber with woven cover and a 2" wire gate carabiner.
- Shortened starboard spring line, aft portion, to move the boat a bit farther from the dock at the bow
- Shortened port spring line, aft portion, so that it is out of the water.
- Removed Ronstan RF1379 cheek block from starboard side of boom. Pull on the center pin of the sheave has deformed the base of the block significantly.
- Removed first reef line.
-
- Need to hoist the main and verify the location for the replacement reefing 5 Series Cheek Block
.
- Need to mark, drill, and tap the boom for the four bolts to secure the replacement reefing block.
- Need to install the replacement reefing block and reeve the reefing line.