Log of Alberg 30 #262 on 05 June 2025


Date: 05 June 2025 1500 till 05 June 2025 1710
Endpoints: Yacht Haven Annapolis to Yacht Haven Annapolis
Purpose: Various Maintanence Items
Complement: Yoni Bresler
Weather: Low 80's

  • Replaced each of two pieces of 1/4" Sta-Set securing the solar panel to the staples on each cockpit locker with a section of solid rubber with woven cover and a 2" wire gate carabiner.
  • Shortened starboard spring line, aft portion, to move the boat a bit farther from the dock at the bow
  • Shortened port spring line, aft portion, so that it is out of the water.
  • Removed Ronstan RF1379 cheek block from starboard side of boom. Pull on the center pin of the sheave has deformed the base of the block significantly.
  • Removed first reef line.
  • Need to hoist the main and verify the location for the replacement reefing 5 Series Cheek Block .
  • Need to mark, drill, and tap the boom for the four bolts to secure the replacement reefing block.
  • Need to install the replacement reefing block and reeve the reefing line.

© Jonathan M. Bresler