Second half of effort begun on 2018-07-30.
Among the items salvaged:
- Mast
- Boom
- Spinnaker pole
- Whisker pole
- Two Merriman cockpit winches
- Anchors: one 25# CQR and two Danforths, one of which is 22#
- Rudder cockpit floor fitting
- Hanging locker door
- Head folding door
- Four cabin ports and frames
- Four v-berth, head, and hanging locker ports
- Port and starboard cabin locker faces
- Anchor rode in anchor locker
- Electrical panel
- Dinghy made by Concordia and oars
- Companionway hatch, hatch boards, and slides
- Icebox top surface
- Ritchie compass mounted in bridgedeck indent
- Bridgedeck indent cover and hinge
- Dodger and dodger frame