Log of Alberg 30 #262 on 26 March 2019


Date: 26 March 2019 11:00 till 26 March 2019 15:00
Endpoints: Smith's Marina to Smith's Marina
Purpose: Wrapping up Winter Projects for now and Preparations for Launch
Complement: Jonathan Bresler
Weather: Low 50's

  • Brought mainsail from Interrupt to Constance.
  • Brought the new 135LP genoa from Bacons to Constance.
  • Disconnected charger. Had been charging at 13.2v at the LiDiVi. After a while, charge dropped to 12.5v at the LiDiVi, which is about 12.7 on the batteries.
  • Washed the underside of the forefoot of the keel with warm water to remove the wax exuded by the epoxy.
  • Sanded the underside of the forefoot of the keel to fair the patch into the keel.
  • Warm water scrubbed the boot stripe.
  • Sanded the companionway sill.
  • Primed the companionway sill with Awlwood Primer.
  • Applied sixth coat of Awlwood to the companionway hatch, lower companionway board, icebox hatch, spinnaker block pads, and fuel fill pad.
© Jonathan M. Bresler