Seven and a half gallons of water in the bilge. Small amount in the hanging locker. Vacuumed out.
Longboarded on each side of the bow where filler was applied on 2024-03-04 and the areas adjacent. Low 60's is too hot for this work. Saturated the top few inches of my jeans from the work.
Requested that the jackstands be moved so that I may longboard their current locations.