Reinstalled stainless steel cap/rub rail on the top surface of the toe rail. Placed a "button" of Need entry for 4200 on top of each screwhole before placing the rail and inserting the screws. Supported the far end, non-working end, of the rail from the lifeline or shroud using a length of cord. Method worked well to support the steel above the toerail with enough flexibility in the rail to allow several screws to be set before adjusting the height of the support.
After the boat was lifted into the slings, painted the full length of the bottom of the keel with Trinidad XSR .
Note: the bottom colors are, from the outermost inward:
From Winter 2024-2025 final photos (2025-03-20):
From Winter 2023-2024 final photos (2024-03-10):
From Winter 2021-2022 final photos (2022-04-11):