2017 Winterization
- Electrical:
- Engine:
- Filled diesel 2017-09-28 and filled again 2017-12-12 to the top with three gallons of diesel.
- Changed engine oil (Shell Rotella T
15W40, 2 quarts) and filter (Yanmar) 2017-11-09
- Changed transmission oil (SAE 30, about 1/3 quart) 2017-11-09
- Propylene glycol run through heat exchanger and allowed to flow out into bilge. 2017-11-29, 2017-11-14 and 2017-11-09
- Raw water strainer and basket cleaned and removed from engine to prevent the propylene glycol from damaging the plastic 2017-12-05, 2017-11-29 and 2017-11-21
- Two raw water pump bolts (12mm heads) removed, greased, and replaced loosely. 2017-12-12
- Raw water pump impeller removed from pump and tied to pump body. 2017-12-12
- Fan belts removed and placed salon forward bulkhead locker port side. 2017-12-12
- General:
- Head:
- Pumped out holding tank, pumped raw water into holding tank, pumped out again. 2017-11-02
- Sails: