Brightwork
- Chimney trim ring: Awlwood initial application April 2019. Cetol: June 2018
- Coamings with Cetol. April 2018, July 2016
- Cockpit icebox: Awlwood maintainence, two coats April 2019, initial application 2018. Cetol: July 2016 FAILED along the seams resulting in the finishing lifting off.
- Cockpit lockers: Awlwood: maintainence, two coats April 2019, initial application April 2018. Cetol: July 2016 FAILED along the seams resulting in the finishing lifting off.
- Companionway slider: Awlwood: initial application April 2019. FAILED along the seams resulting in the finishing lifting off.
- Companionway trim: Awlwood: maintainence, two coats April 2019, initial application April 2018. Cetol: July 2016
- Fuel fill pad: Awlwood: initial application April 2019.
- Handrails:
- Lazarette hatch: Awlwood: initial application June 2019. FAILED along the seams resulting in the finishing lifting off.
- Spinnaker block pads: Awlwood: initial application April 2019.
- Tiller: Replaced with new RudderCraft
Model G
. Varnished eight coats of Epiphanes High Gloss Clear Varnish
beginning on 2023-03-28.
- Toe rails:
- Inboard side with Cetol: August 2019, November 2016
- Outboard side with Cetol: November 2019.
- V-berth Hatch sides: Awlwood: initial application April 2019. FAILED along the seams but without the finishing lifting off completely, rather it hangs in place.
- Washboard (lower): Awlwood: initial application April 2019. FAILED along the seams but without the finishing lifting off completely, rather it hangs in place.
- Washboard (upper): Cetol July 2016.
Cabin
- Bilge Pumps
- Main Cabin
- V-Berth
- Painted berths, walls, shelves, and overhead.
- Installed cedar ceiling on sides above berths, below shelves, after removing pegboard.
Electrical
Engine
Hanging Locker
Head
Hull
- Bottom Sanding and Painting
- Thru Hull Valves
- Engine discharge 1/-1/4" gate valve replaced with Groco FBV 2016-01-10.
- Galley intake glassed closed 2016-03-24
- Galley sink discharge 1" frozen ball valve replaced with Groco 2016-03-28.
- Head discharge 1-1/4" frozen ball valve replaced with Groco FBV 2019-03-15.
- Head intake 3/4" valve replaced with Groco FBV 2016-03-28.
- Winch Pedestals: fabricated forward and installed: June/July 2019
Other
Rigging
- Mast
- Standing Rigging
- Running Rigging
Sails